arrow_back
Module 1: Introduction to SMM UAE
1-UAE-Standard-Method-of-Measurement
1.1 Purpose and Need for a Standard Method of Measurement
1.2 Scope and Applicability in UAE Construction Industry
1.3 Relationship with Contracts, Drawings, and Specifications
Module 2: Principles and Rules of Measurement
2-UAE-Standard-Method-of-Measurement
2.1 General Rules of Measurement and Description
2.2 Unit of Measurement and Standardized Terminology
2.3 Interpretation of Measurement Clauses in UAE Projects
Module 3: Documentation and Measurement Process
3-Documentation-and-Measurement-Process
3.1 Sequence of Measurement and Documentation Flow
3.2 Preparation of Bills of Quantities (BOQ) as per SMM UAE
3.3 Cross-Referencing Drawings and Specifications
Module 4: Measurement of Site Preparation Works
4-Measurement-of-Site-Preparation-Works
4.1 Clearing, Grubbing, and Site Grading
4.2 Excavation and Disposal of Materials
4.3 Measurement Rules for Dewatering and Backfilling
Module 5: Measurement of Earthworks
5-Measurement-of-Earthworks
5.1 Excavation in Different Strata (Soft/Hard/Blasted)
5.2 Embankment, Filling, and Compaction Measurement
5.3 Measurement of Trench, Pit, and Foundation Excavation
Module 6: Concrete Works
6-Concrete-Works
6.1 Measurement of Formwork, Reinforcement, and Concrete Volume
6.2 In-Situ Concrete vs. Precast Concrete
6.3 Measurement Rules for Concrete Finishes and Treatments
Module 7: Masonry Works
7-Masonry-Works-SMM-UAE-Module
7.1 Brickwork, Blockwork, and Stonework Measurement
7.2 Mortar, Pointing, and Jointing
7.3 Deductions and Openings Measurement Rules
Module 8: Structural Steel Works
8-Structural-Steel-Works-UAE-SMM-Measurement-Standards
8.1 Measurement of Steel Members and Connections
8.2 Welding, Bolting, and Surface Treatment
8.3 Measurement for Fabrication and Erection
Module 9: Roofing and Waterproofing
9-Roofing-and-Waterproofing
9.1 Measurement of Roof Layers and Insulation
9.2 Waterproofing Membranes and Vapour Barriers
9.3 Measurement of Flashings, Gutters, and Trims
Module 10: Finishing Works
10-Finishing-Works
10.1 Plastering, Rendering, and Screeding
10.2 Painting, Polishing, and Wall Coatings
10.3 Tiling and Flooring Works Measurement
Module 11: Carpentry and Joinery
11-Carpentry-and-Joinery-in-UAE-Construction
11.1 Measurement of Doors, Windows, and Frames
11.2 Joinery Fixings and Hardware
11.3 Built-in Furniture and Paneling
Module 12: Metal Works and Aluminum Fabrications
12-Metal-Works-and-Aluminium-Fabrications
12.1 Measurement of Railings, Handrails, and Grilles
12.2 Aluminum Doors, Windows, and Curtain Walls
12.3 Measurement of Metal Fixings and Accessories
Module 13: Mechanical, Electrical, and Plumbing (MEP) Coordination
13-Mechanical-Electrical-and-Plumbing-MEP-Coordination
13.1 Principles for Measuring MEP Works under SMM UAE
13.2 Provisional and Prime Cost Sums for Services
13.3 Coordination between Civil and MEP BOQ Sections
Module 14: External Works and Landscaping
14-External-Works-and-Landscaping
14.1 Pavements, Kerbs, and Drainage Channels
14.2 Soft Landscaping – Turfing, Planting, and Irrigation
14.3 Hard Landscaping – Paving, Lighting, and Furniture
Module 15: Measurement of Roads and Infrastructure Works
15-Measurement-of-Roads-and-Infrastructure-Works
15.1 Subgrade, Subbase, and Asphalt Layers
15.2 Road Furniture and Signage
15.3 Measurement for Culverts, Kerbs, and Edge Restraints
Module 16: Measurement of Specialized Works
16-Measurement-of-Specialised-Works
16.1 Waterproofing Basements and Retaining Structures
16.2 Fireproofing and Acoustic Treatments
16.3 External Facade and Cladding Works
Module 17: Provisional and Prime Cost Sums
17.1 Definition and Use of Provisional Sums
17.2 Prime Cost Sums and Adjustments
17.3 Procedures for Valuation of Provisional Items
17-Provisional-and-Prime-Cost-Sums_pdf
Module 18: Variations and Re-measurement under SMM UAE
18-Variations-and-Re-measurement-under-SMM-UAE
18.1 Variation Orders and Re-measured Quantities
18.2 Procedures for Adjusting BOQ Quantities
18.3 Documentation for Change Management
Module 19: Preparing the Final Bill and Tender Evaluation
19-Preparing-the-Final-Bill-and-Tender-Evaluation
19.1 Compilation of Measured Quantities and Rates
19.2 BOQ Verification during Tendering and Post-Award
19.3 Reconciliation between Drawings, Site, and BOQ
Module 20: Case Studies and Practical Measurement Exercises
20-Case-Studies-and-Practical-Measurement-Exercises
20.1 Example-Based Measurement from UAE Projects
20.2 Common Errors and How to Avoid Them
20.3 Practical Application for BOQ Preparation
Preview - UAE Standard Method of Measurement (SMM UAE) – Professional Certification for Quantity Surveyors and Civil Engineers
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US
FEES OFFERS
Extra Discounts!!