arrow_back
Module 1: Introduction to SMM Oman
1-Oman-Standard-Method-of-Measurement-SMM-Oman
Understanding the Purpose and Scope of SMM Oman
Role of Standardization in Tendering and Estimation
Comparison with UK SMM7, CESMM & GCC Standards
Module 2: General Rules of Measurement
2-General-Rules-of-Measurement
Units of Measurement and Conversion Principles
General Rules and Notes to Measurement (GRM)
Standard Format for Bill Preparation
Module 3: Site Preparation and Earthworks
3-Site-Preparation-and-Earthworks
Site Clearance, Excavation, and Filling Measurement Rules
Classification of Soils and Rocks under SMM Oman
Measurement of Disposal, Dewatering & Compaction Works
Module 4: Concrete Works
4-Concrete-Works-Measurement
Measurement of Formwork, Reinforcement & Concrete Volume
Distinction Between In-Situ, Precast & Cast-in-Place Elements
Standard Deductions and Tolerances in Concrete Quantities
Module 5: Masonry Works
5-Masonry-Works
Measurement Rules for Blockwork, Brickwork, and Stonework
Mortar Thickness and Joint Considerations
Openings, Chases, and Finishes Adjustments
Module 6: Reinforcement & Steel Measurement
6-Reinforcement-and-Steel-Measurement
Weight-based vs Length-based Measurement
Laps, Hooks, and Bends Allowance Rules
Structural Steel and Rebar Schedule Interpretation
Module 7: Formwork and Falsework
7-Formwork-and-Falsework
Classification of Surfaces: Fair-Faced, Rough-Finished, etc.
Measurement Rules for Columns, Beams & Slabs
Special Conditions for Repeated Use of Formwork
Module 8: Finishes and Surface Treatments
8-Finishes-and-Surface-Treatments
Measurement for Plastering, Rendering, and Painting
Tiling, Marble, and Cladding Measurement Standards
Surface Preparation and Wastage Considerations
Module 9: Waterproofing and Insulation Works
9-Waterproofing-and-Insulation-Works
Measurement Rules for Membranes, Coatings & Bituminous Layers
Roof, Basement, and Tank Waterproofing Classification
Insulation and Damp-Proof Courses – Quantity Methods
Module 10: Road and Pavement Works (MoTC Aligned)
10-Road-and-Pavement-Work
Measurement for Subgrade, Subbase & Base Courses
Asphalt Layer and Kerbing Measurement Rules
Road Markings, Road Furniture & Ancillary Works
Module 11: Structural Steel & Metal Works
11-Structural-Steel-and-Metal-Works
Structural Connections and Welding Measurement Rules
Fabrication vs Erection Quantities
Miscellaneous Metal Works (Gratings, Handrails, Ladders)
Module 12: Drainage & Sewerage Systems
12-Drainage-and-Sewerage-Systems
Measurement of Pipes, Manholes, and Chambers
Bedding, Backfilling & Testing Measurement Rules
Ancillary Items – Gullies, Gratings, and Covers
Module 13: Water Supply & Plumbing Works
13-Water-Supply-and-Plumbing-Works-Measurement
Pipework and Fittings Measurement under SMM Oman
Valves, Tanks & Fixtures – Measurement and Classification
Connection, Testing, and Commissioning Works
Module 14: Electrical & Mechanical Works (Basic Overview)
14-Electrical-and-Mechanical-Works
Measurement of Conduits, Cabling & Electrical Fittings
HVAC Ducting and Equipment Quantity Standards
Mechanical Installation and Testing Allowances
Module 15: Roofing and Structural Timber Works
Measurement Rules for Trusses, Rafters, and Purlins
Boarding, Roof Sheeting & Accessories
Treatment, Fixing & Fastening Quantities
Module 16: Painting, Decoration & Finishing Details
16-Painting-Decoration-and-Finishing-Details
Surface Area Measurement Rules under SMM Oman
Priming, Finishing Coats, and Decorative Elements
Deductions for Openings, Mouldings, and Decorative Features
Module 17: External Works & Landscaping
17-External-Works-and-Landscaping
Boundary Walls, Gates, and Hardscape Measurement
Landscaping Elements: Turfing, Plants & Irrigation Lines
External Drainage, Lighting & Footpath Quantities
Module 18: Measurement of Provisional & Prime Cost Items
18-Measurement-of-Provisional-and-Prime-Cost-Items
Understanding Provisional Sums & PC Sums
How to Include PS & PC Items in BOQ
Adjustments during Contract Execution
Module 19: Preparation of Bill of Quantities as per SMM Oman
19-Preparation-of-Bill-of-Quantities-as-per-SMM-Oman
Structure and Order of BOQ (Sections & Headings)
Item Description Writing and Coding Standards
Practical Example: BOQ Page Setup for Oman Tender Board
Module 20: Dispute Resolution, Auditing & Best Practices
20-Dispute-Resolution-Auditing-and-Best-Practices
Common Discrepancies in Measurement and Valuation
Auditing BOQ & Quantity Verification During Execution
Best Practices for Compliance with SMM Oman in Tenders
Preview - Oman Standard Method of Measurement (SMM Oman) – Professional Certification for Civil Engineers & Quantity Surveyors
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US
FEES OFFERS
Extra Discounts!!