Module 1: Introduction to Interior & Fit-Out Execution in High-Rise Projects
1-Practical-Site-Execution-Methods-for-Interior-and-Fit-Out-Projects-in-High-Rise-Buildings
1.1 Overview of Interior and Fit-Out Works Scope in High-Rise Buildings
1.2 Key Interfaces: Civil, MEP, Architectural & Finishing Coordination
1.3 Site Setup, Mobilization, and Work Sequencing Strategy
Module 2: Site Preparation, Survey, and Setting Out for Interior Works
2-Site-Preparation-Survey-and-Setting-Out-for-Interior-Works
2.1 Setting Out for Partitions, Ceiling, and Flooring Layouts
2.2 Benchmarks, Levels, and Tolerances as per Site Conditions
2.3 Pre-Execution Inspection and Clearance Checklist
Module 3: Drywall & Partition Execution Methods
3-Drywall-and-Partition-Execution-Methods
3.1 Framing, Stud, and Track Installation Techniques
3.2 Gypsum, Cement Board, and Acoustic Partition Fixing Methods
3.3 Joint Treatment, Finishing, and Fire Rating Compliance
Module 4: Ceiling Execution and Alignment Works
4-Ceiling-Execution-and-Alignment-Works
4.1 Grid Ceiling, Gypsum Ceiling, and False Ceiling Installation
4.2 Service Coordination – Light Fixtures, Diffusers, Sprinklers, and Access Panels
4.3 Finishing Alignment, Level Checking, and Joint Sealing
Module 5: Flooring and Skirting Works Execution
5-Flooring-and-Skirting-Works-Execution
5.1 Substrate Preparation and Leveling (Screed, Self-Leveling Compound)
5.2 Tiling, Stone, Vinyl, and Wooden Flooring Installation Practices
5.3 Skirting, Edge Detailing, and Expansion Joint Treatments
Module 6: Joinery and Carpentry Works
6-Joinery-and-Carpentry-Works
6.1 Site Measurement, Shop Drawings, and Fabrication Coordination
6.2 Door Frames, Shutters, and Paneling Installation Methods
6.3 Hardware Fitting, Alignment, and Quality Inspection
Module 7: Painting, Polishing, and Wall Finishing Methods
7-Painting-Polishing-and-Wall-Finishing-Methods
7.1 Surface Preparation and Primer Application Procedures
7.2 Paint Types, Texture, and Application Methods for Interior Walls
7.3 Polishing, Laminate, and Decorative Wall Finishes Execution
Module 8: MEP Coordination within Interior Works
8-MEP-Coordination-within-Interior-Works
8.1 Coordination between Electrical, HVAC, Plumbing, and Interior Finishes
8.2 Access Panel Provision, Concealment, and Service Route Planning
8.3 Testing, Tagging, and MEP Clearance Prior to Final Finishes
Module 9: Acoustic, Fireproofing, and Insulation Works
9-Acoustic-Fireproofing-and-Insulation-Works
9.1 Acoustic Ceiling, Partition, and Flooring Systems Installation
9.2 Firestopping Around Penetrations, Ducts, and Cable Trays
9.3 Thermal and Moisture Insulation Fixing Methods
Module 10: Site Coordination, Material Handling, and Work Sequencing
10-Site-Coordination-Material-Handling-and-Work-Sequencing
10.1 Site Coordination between Multiple Trades and Workfront Allocation
10.2 Material Handling, Storage, and Protection at High-Rise Sites
10.3 Sequential Planning for Finishes – From Core to Fit-Out
Module 11: Quality Control, Mockups, and Inspection Procedures
11-Quality-Control-Mockups-and-Inspection-Procedures
11.1 Preparing and Approving Mockups for Workmanship Standards
11.2 Quality Checklists for Civil, Interior, and MEP Interfaces
11.3 Inspection Formats and Handover Readiness Checklist
Module 12: Health, Safety, and Site Supervision Practices
12.1 Safety Precautions During Interior Execution at Height and Confined Spaces
12.2 Safe Material Handling and Housekeeping in Fit-Out Areas
12.3 Site Supervision, Coordination Meetings, and Daily Reporting Practices
Module 13: Coordination, Handover, and Snag Rectification in Fit-Out Projects
13-Coordination-Handover-and-Snag-Rectification-in-Fit-Out-Projects
13.1 Snag Identification and Categorization
13.2 Snag Rectification and Re-inspection Procedure
13.3 Final Handover Documentation and As-Built Submissions
Module 14: Interior Site Management, Workforce Control & Daily Progress Monitoring
14-Interior-Site-Management-Workforce-Control-and-Daily-Progress-Monitoring
14.1 Manpower Planning and Productivity Tracking
14.2 Site Supervision and Coordination Meetings
14.3 Progress Monitoring Reports and Lookahead Planning
Module 15: Value Engineering, Cost Control & Finishing Quality Optimization
15-Value-Engineering-Cost-Control-and-Finishing-Quality-Optimization
15.1 Value Engineering in Interior Execution
15.2 Cost Control During Material Procurement and Wastage Management
15.3 Achieving High-End Finishing Quality at Controlled Cost
Preview - Practical Site Execution Methods for Interior & Fit-Out Projects for High-Rise Building Projects – Professional Certification
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US
FEES OFFERS
Extra Discounts!!