arrow_back
Module 1: Kuwait Construction Industry Framework
1-Kuwait-Construction-Industry-Framework
1.1 Overview of Kuwait Construction Sector and Major Clients (MPW, PAAET, KIPIC, KOC, KNPC)
1.2 Key Regulations, Building Codes, and Ministerial Guidelines
1.3 Understanding the Kuwait Tendering System (C.A.P.T., MoP, Municipality Roles)
Module 2: Project Initiation and Feasibility Studies
2-Project-Initiation-and-Feasibility-Studies
2.1 Pre-feasibility Assessment and Market Demand Analysis
2.2 Cost–Benefit Evaluation and Financial Viability
2.3 Preparing Project Brief and Client Requirements under Kuwait Norms
Module 3: Project Planning and Scheduling
3-Project-Planning-and-Scheduling
3.1 Developing Work Breakdown Structures (WBS) for Kuwaiti Projects
3.2 Project Scheduling and Critical Path Method (CPM) Principles
3.3 Time–Cost Integration and Progress Control Practices
Module 4: Contract Administration and Procurement in Kuwait
4-Contract-Administration-and-Procurement-in-Kuwait
4.1 Types of Contracts (Lump Sum, Re-measure, Cost Plus, EPC)
4.2 Kuwait Tender Board and Procurement Procedures
4.3 Bid Evaluation, Award, and Contract Mobilization
Module 5: Project Cost Control and BOQ Management
5-Project-Cost-Control-and-BOQ-Management
5.1 Preparing BOQ as per Kuwait PWA and MPW Standards
5.2 Cost Estimation, Budgeting, and Financial Tracking
5.3 Variation Orders, Claims, and Cost Adjustments
Module 6: Design Coordination and Technical Review
6-Design-Coordination-and-Technical-Review
6.1 Reviewing Architectural, Structural, and MEP Drawings
6.2 Managing Design Changes and Shop Drawing Approvals
6.3 Coordination Between Consultants, Contractors, and Authorities
Module 7: Construction Site Management and Execution
7-Construction-Site-Management-and-Execution
7.1 Site Mobilization and Layout Planning
7.2 Daily Construction Supervision and Progress Tracking
7.3 Managing Manpower, Materials, and Equipment Efficiency
Module 8: Quality Control and Assurance in Kuwait Projects
8-Quality-Control-and-Assurance-in-Kuwait-Projects
8.1 Quality Control Plan (QCP) and Inspection Test Plan (ITP)
8.2 Material Approval, Sampling, and Inspection Protocols
8.3 Handling NCRs, Snag Lists, and Quality Audits
Module 9: Health, Safety, and Environmental Management
9-Health-Safety-and-Environmental-Management-in-Kuwait-Construction
9.1 Kuwait HSE Regulations and Safety Permits
9.2 Hazard Identification, Risk Assessment, and Control Measures
9.3 Environmental Protection, Waste Management, and Safety Culture
Module 10: Project Risk Management
10-Project-Risk-Management
10.1 Identifying Financial, Technical, and Contractual Risks
10.2 Risk Assessment, Prioritization, and Mitigation Strategies
10.3 Monitoring and Reviewing Risk During Project Lifecycle
Module 11: Construction Resource Management
11-Construction-Resource-Management
11.1 Manpower Planning and Productivity Optimization
11.2 Material Procurement and Inventory Control
11.3 Equipment Allocation, Maintenance, and Utilization Efficiency
Module 12: Project Monitoring and Reporting
12-Project-Monitoring-and-Reporting
12.1 Establishing KPIs and Performance Dashboards
12.2 Weekly, Monthly, and Milestone Progress Reporting
12.3 Delay Analysis and Corrective Action Plans
Module 13: Legal and Contractual Compliance
13.1 Understanding Kuwaiti Construction Laws and Civil Codes
13.2 Contractual Obligations, Dispute Avoidance, and Resolution
13.3 Arbitration, Claims, and Legal Documentation Practices
13-Legal-and-Contractual-Compliance-in-Kuwait-Construction_pdf
Module 14: Project Handover and Closeout
14-Project-Handover-and-Closeout
14.1 Testing, Commissioning, and Final Inspections
14.2 Documentation for Handover and Operation Manuals
14.3 Project Evaluation, Lessons Learned, and Post-Occupancy Review
Module 15: Leadership, Communication, and Team Management
15-Leadership-Communication-and-Team-Management
15.1 Managing Multinational Workforce and Stakeholder Communication
15.2 Leadership Techniques for Site and Office Teams
15.3 Ethical Practices, Professional Conduct, and Client Relations
Preview - Level 2: Construction Project Manager (CPM–Kuwait) Professional Certification Course
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US
FEES OFFERS
Extra Discounts!!