There are no items in your cart
Add More
Add More
Item Details | Price |
---|
Quantity Surveying for Sewage Treatment and Wastewater Plants Online Course
Language: ENGLISH
Instructors: BHADANIS QUANTITY SURVEYING AND ESTIMATION BILLING PLANNING TRAINING INSTITUTE FOR CIVIL ENGINEERS
Validity Period: 200 days
4 BHADANIS Institute Coins as Cashback
Why this course?
Submodule 1.1: Overview of Sewage Treatment and Wastewater Plants
Basics of sewage treatment processes (primary, secondary, tertiary)
Types of wastewater plants (municipal, industrial, decentralized)
Importance of cost control in wastewater projects
Submodule 1.2: Role of Quantity Surveyor in Wastewater Plant Projects
Key responsibilities and deliverables
Stakeholders involved and collaboration
Site visits and project familiarization
Submodule 1.3: Understanding Project Documentation
Study of tender documents, drawings, and specifications
Bill of Quantities (BOQ) relevance
Reading process flow diagrams (PFD) and piping & instrumentation diagrams (P&ID)
Submodule 1.4: Key Terminology and Units of Measurement
Common terms in wastewater engineering and construction
Units used for measurement (cubic meters, liters, mm, kg, etc.)
Measurement standards and guidelines applicable
Submodule 2.1: Measurement of Earthworks and Excavation
Techniques for measuring excavation for tanks, trenches, and pipelines
Example: Calculating excavation volume for a sedimentation tank (template provided)
Submodule 2.2: Measurement of Concrete and Reinforcement Works
Measuring foundations, tanks, slabs, and channels
Reinforcement bar estimation for concrete structures
Practical example: Calculating concrete volume and steel weight for a sludge digester
Submodule 2.3: Measurement of Pipeworks and Fittings
Measuring lengths, diameters, and fittings of pipelines
Example: Estimating quantities for a 500-meter HDPE pipeline installation
Submodule 2.4: Measurement of Mechanical and Electrical Equipment Installation
Basics of measuring equipment installation works
Example: Quantifying installation scope for pumps and motors
Template: Equipment installation checklist and measurement sheet
Submodule 3.1: Structure and Format of BOQ for Wastewater Plants
BOQ headings and breakdown
Grouping items by civil, mechanical, and electrical works
Submodule 3.2: Writing Descriptions for Sewage Treatment Works
Clear, unambiguous item descriptions
Example: Describing "Supply and laying of 400mm dia RCC pipes with fittings"
Submodule 3.3: Common BOQ Items in Sewage Treatment
Listing typical items with quantities (excavation, concrete, pipes, equipment)
Template: Standard BOQ sample for a small treatment plant
Submodule 3.4: Cross-Checking and Validation of BOQ
Methods for checking accuracy and completeness
Peer review and client validation processes
Real scenario: Handling discrepancies found during validation
Submodule 4.1: Basics of Rate Analysis for Sewage Treatment Items
Components of rate (material, labor, equipment, overheads)
Sources for rate data (market rates, schedule of rates)
Submodule 4.2: Rate Analysis for Civil Works
Example: Rate analysis of reinforced concrete for tanks
Template: Detailed rate analysis sheet with formulas
Submodule 4.3: Rate Analysis for Mechanical and Electrical Works
Pumps, blowers, piping installation
Example: Rate build-up for pump installation including labor and accessories
Submodule 4.4: Contingencies, Profit Margins, and Escalation Factors
Adding contingencies for unforeseen works
Incorporating profit and escalation
Real case: Adjusting cost estimates due to material price inflation
Submodule 5.1: Preparing Project Budgets for Sewage Treatment Plants
Setting baseline budgets from BOQ and rates
Example: Budget sheet template for a medium-scale plant
Submodule 5.2: Monitoring and Controlling Costs on Site
Cost tracking tools (manual methods)
Change order management and impact on costs
Submodule 5.3: Managing Variations and Claims
Identifying and quantifying variations
Preparation of variation statements
Real scenario: Handling a design change in the aeration tank
Submodule 5.4: Reporting and Communication of Cost Information
Preparing cost reports for clients and management
Example: Monthly cost status report template
Submodule 6.1: Understanding Procurement in Wastewater Projects
Types of procurement (direct purchase, subcontracting)
Tendering processes and documentation
Submodule 6.2: Contract Types and Their Cost Implications
Lump sum, cost-plus, unit rate contracts
Example: Impact of contract type on cost control
Submodule 6.3: Preparation of Payment Schedules and Interim Valuations
Measurement of work done for interim payments
Template: Interim valuation format for civil and mechanical works
Submodule 6.4: Contractual Risk Management
Identifying risks related to costing
Mitigation measures in contract clauses
Real scenario: Managing delay claims due to equipment delivery
Submodule 7.1: Methods for On-Site Measurement Verification
Tools and techniques for measurement checking
Example: Measurement of installed pipelines using tape and level
Submodule 7.2: Maintaining Measurement Books and Field Records
Best practices for record keeping
Sample measurement book entries for excavation and concreting
Submodule 7.3: Reconciling Site Measurements with BOQ
Handling discrepancies between actual and estimated quantities
Real case: Quantity reconciliation after unexpected soil conditions
Submodule 7.4: Documentation for Audit and Compliance
Importance of accurate records for audits
Template: Site measurement and verification checklist
Submodule 8.1: Principles of Work Valuation in Wastewater Projects
Approaches to valuation (percentage completion, milestone)
Examples of work valuation during project stages
Submodule 8.2: Preparation of Final Account Statements
Components of final accounts (original contract, variations, adjustments)
Template: Final account summary for a wastewater plant
Submodule 8.3: Settlement of Disputes Related to Costs
Common causes of disputes in cost claims
Resolution techniques and negotiation tips
Submodule 8.4: Closing Out Financials and Project Handover
Final payment procedures and documentation
Real scenario: Final account settlement with client sign-off
Submodule 9.1: Incorporating Health & Safety Costs in Estimates
Safety measures and their cost impact
Example: Costing for PPE and safety signage
Submodule 9.2: Environmental Compliance and Waste Management Costs
Estimating costs for waste disposal and treatment
Example: Costing for sludge removal and disposal
Submodule 9.3: Risk Assessment and Mitigation in Costing
Identifying environmental and safety risks
Adding risk contingency costs in estimates
Submodule 9.4: Sustainable Practices and Cost Benefits
Cost implications of sustainable materials and methods
Case study: Use of recycled aggregates in treatment plant construction
Submodule 10.1: Case Study 1: Costing of a Small Municipal Sewage Treatment Plant
Step-by-step costing walkthrough with real data
Template: Complete BOQ and rate analysis filled example
Submodule 10.2: Case Study 2: Budgeting and Cost Control in an Industrial Wastewater Plant
Managing budget deviations and cost overruns
Template: Cost tracking and variation statement example
Submodule 10.3: Practical Exercise: Preparing a BOQ from Drawings and Specifications
Students work on sample drawings to prepare BOQ
Template: BOQ preparation worksheet
Submodule 10.4: Practical Exercise: Rate Analysis and Cost Estimation for Selected Items
Hands-on rate analysis for pipes, concrete, and equipment installation
Template: Rate analysis worksheet with formulas
After successful purchase, this item would be added to your courses.You can access your courses in the following ways :