There are no items in your cart
Add More
Add More
Item Details | Price |
---|
Quantity Surveying & Costing for Fire Stations and Emergency Services Buildings Online Course
Language: ENGLISH
Instructors: BHADANIS QUANTITY SURVEYING & CONSTRUCTION MANAGEMENT INTERNATIONAL TRAINING INSTITUTE 2016
Validity Period: 200 days
4 BHADANIS Institute Coins as Cashback
Why this course?
Submodule 1.1: Understanding Fire Station and Emergency Services Building Types
Overview of fire station typologies (urban, rural, airport fire stations)
Key functional areas: garages, control rooms, training areas, accommodation, etc.
Real scenario: Cost implications of different facility sizes and features
Submodule 1.2: Scope of Quantity Surveying in Emergency Services Buildings
Defining the role of QS in specialized buildings with unique safety features
Critical cost elements unique to fire stations (e.g., fire-resistant materials, alarm systems)
Example: Preparing QS scope for a mid-sized urban fire station
Submodule 1.3: Project Lifecycle and QS Involvement
Stages: Feasibility, Design, Tender, Construction, Completion
QS responsibilities at each stage specific to emergency services projects
Template: Project timeline with QS deliverables mapped out
Submodule 1.4: Key Challenges and Risk Factors in Fire Station Costing
Regulatory compliance costs (fire codes, safety standards)
Emergency equipment integration and its cost impact
Risk scenario: Cost overruns due to last-minute fire safety upgrades
Submodule 2.1: Civil and Structural Works Quantification
Quantifying foundations, slabs, columns, walls with fire-resistant requirements
Example: Quantity takeoff for concrete fireproof walls
Template: Quantity Takeoff Sheet for structural elements
Submodule 2.2: Architectural Elements and Finishes
Quantification of specialized finishes (non-slip floors, fireproof doors, windows)
Real scenario: Measuring and costing of fire-rated doors and glazing
Template: Finishes and Fixtures Quantity Sheet
Submodule 2.3: Mechanical and Electrical Provisions Quantification
Quantifying ducts, sprinklers, alarms, ventilation, electrical wiring specific to emergency buildings
Example: Quantity takeoff for fire suppression system piping
Template: MEP Quantification Sheet
Submodule 2.4: External Works and Landscaping Quantities
Access roads, parking for fire trucks, drainage, signage
Scenario: Estimating cost for reinforced pavement to support heavy fire trucks
Template: External Works Quantity Sheet
Submodule 3.1: Preparing Rate Analysis for Fire-Resistant Materials
Calculating cost of materials like fireproof concrete, intumescent paint
Example: Rate analysis for fire-resistant cladding system
Template: Rate Analysis Worksheet
Submodule 3.2: Labor and Equipment Costing Specific to Fire Station Construction
Skilled labor rates for specialized trades (fire system installation)
Equipment hire for large fire truck bays
Scenario: Labor and equipment costing for training tower construction
Submodule 3.3: Overhead and Profit Margins in Emergency Services Projects
Typical overhead percentages for government vs. private fire station projects
Profit margin adjustments for specialized emergency service installations
Template: Overhead and Profit Calculation Sheet
Submodule 3.4: Cost Escalation and Contingency Planning
Allowances for price fluctuations of steel, concrete, and fire safety systems
Scenario: Contingency budgeting after mid-project specification change
Template: Contingency and Escalation Calculation Table
Submodule 4.1: Structuring BOQ for Fire Stations
Organizing BOQ sections by civil, architectural, MEP, external works
Special items unique to emergency buildings (training facilities, alarm systems)
Example: Sample BOQ structure for a small fire station
Submodule 4.2: Writing Clear Descriptions and Specifications
Writing item descriptions with fire safety compliance references
Scenario: Avoiding ambiguity in alarm system item descriptions
Template: BOQ Item Description Guide
Submodule 4.3: Measurement Rules and Standards for Fire Station QS
Applying IS codes and standards for measurement relevant to fire stations
Example: Measuring complex pipework for fire sprinkler systems
Template: Measurement Rules Summary Sheet
Submodule 4.4: Quality Control and Checking BOQ Accuracy
Cross-checking quantities, unit consistency, and rate application
Scenario: Detecting under-quantification of fire-resistant materials
Template: BOQ Checking and Validation Checklist
Submodule 5.1: Preparing Tender Documents for Fire Station Projects
Including specialized specifications and compliance clauses
Example: Tender document section for emergency lighting system installation
Submodule 5.2: Evaluating Contractor Bids with QS Inputs
Comparing tenders considering specialty item costs
Scenario: Handling bid variations on fire suppression systems
Submodule 5.3: Cost Negotiation Techniques for Emergency Services Buildings
Negotiation tips focusing on cost-saving without compromising safety
Example: Negotiating cost for fire alarm system maintenance contract
Submodule 5.4: Contract Administration and Cost Control During Construction
Monitoring progress payments, change orders, and variations
Scenario: Cost control during emergency equipment installation delays
Template: Cost Control and Variation Register
Submodule 6.1: Preparing Preliminary Cost Plans Based on Concept Designs
Using historical data and benchmarks for initial budgeting
Example: Budget estimate for a 2-bay fire station with training tower
Submodule 6.2: Budget Allocation for Specialized Emergency Equipment
Allocating budget for fire trucks, communication systems, safety gear
Scenario: Prioritizing budget for critical equipment in phased construction
Submodule 6.3: Lifecycle Costing and Maintenance Budgeting
Estimating future maintenance costs of fire station infrastructure
Example: Budget for periodic inspection and replacement of sprinkler systems
Submodule 6.4: Reporting and Presenting Cost Plans to Stakeholders
Writing clear cost reports with risk and contingency explanations
Template: Cost Planning Report Sample
Submodule 7.1: Identifying Cost Risks in Fire Station Projects
Delays, regulatory changes, supply chain for specialized materials
Scenario: Impact of delayed delivery of fire trucks on project costs
Submodule 7.2: Risk Mitigation Strategies in Quantity Surveying
Contingency planning, alternative sourcing, schedule buffers
Example: Mitigating risk of price escalation in steel procurement
Submodule 7.3: Implementing Cost Control Measures On-Site
Daily cost tracking, progress monitoring, variation management
Template: On-site Cost Tracking Sheet
Submodule 7.4: Reporting and Managing Variations and Claims
Documenting and quantifying change orders, claim management
Scenario: Cost claim for additional fireproofing after design change
Template: Variation Order Form
Submodule 8.1: Quantifying and Costing Fire Alarm and Detection Systems
Components: detectors, panels, wiring, testing
Example: Rate analysis and costing for fire detection system
Submodule 8.2: Sprinkler and Fire Suppression System Costing
Materials, installation, testing, and commissioning costs
Scenario: Cost estimate for wet pipe sprinkler system
Submodule 8.3: Emergency Lighting and Exit Signage Cost Estimation
Energy-efficient lighting options, installation complexities
Template: Emergency Lighting Cost Breakdown
Submodule 8.4: Fireproofing and Structural Protection Costing
Fire-retardant coatings, cladding, protective barriers
Example: Calculating cost for intumescent paint application
Submodule 9.1: Understanding Fire Safety Codes and Cost Implications
Overview of NFPA, IS codes, and local regulations
Scenario: Additional costs due to compliance with updated fire codes
Submodule 9.2: Environmental and Safety Regulations Impact on Costing
Sustainable material requirements, hazardous material handling
Example: Cost impact of using eco-friendly fireproof materials
Submodule 9.3: Documentation and Certification Costs
Third-party inspection, certification fees, testing costs
Template: Compliance Cost Tracking Sheet
Submodule 9.4: Insurance and Warranty Cost Considerations
Insurance premiums, bonding, warranty reserves in costing
Scenario: Budgeting for extended warranty on fire suppression equipment
Submodule 10.1: Case Study - Cost Estimation of an Urban Fire Station Project
Detailed walk-through of quantity surveying and costing steps
Real scenario with budget challenges and solutions
Submodule 10.2: Case Study - Emergency Services Building Renovation Costing
Managing quantities and costs during retrofitting and upgrades
Example: Cost control during life safety system retrofit
Submodule 10.3: Templates for QS Documentation in Fire Station Projects
Complete set of templates: Quantity Takeoff, Rate Analysis, BOQ, Variation Orders, Cost Reports
Submodule 10.4: Best Practices and Lessons Learned from Fire Station Projects
Summary of key takeaways, common pitfalls, and recommendations
After successful purchase, this item would be added to your courses.You can access your courses in the following ways :