There are no items in your cart
Add More
Add More
Item Details | Price |
---|
Pre-Construction Phase Management for Large Township & High-Rise Building Projects Online Training
Language: ENGLISH
Instructors: BHADANIS CONSTRUCTION MANAGEMENT ONLINE TRAINING INSTITUTE INDIA AND GCC GULF
Validity Period: 265 days
4 BHADANIS Institute Coins as Cashback
Why this course?
Pre-Construction Phase Management for Large Township & High-Rise Building Projects
1.1 Overview of Pre-Construction Phase and Its Importance
Definition, scope, and key objectives in large township & high-rise projects
1.2 Stakeholder Identification and Engagement
Roles of owners, consultants, contractors, authorities, and community
1.3 Pre-Construction Project Lifecycle and Milestones
Phases from conceptualization to construction start
1.4 Challenges and Risks in Pre-Construction of Large Projects
Typical risks in scope, cost, time, compliance, and quality
2.1 Site Analysis and Feasibility Study
Soil investigations, environmental impact, utilities availability
2.2 Conceptual Design and Master Planning
Township layout, zoning, and high-rise building massing
2.3 Financial Feasibility and Funding Options
Cost estimates, investment appraisal, funding sources
2.4 Approvals and Permits Planning
Planning permissions, building regulations, environmental clearances
3.1 Detailed Client and Stakeholder Requirements Analysis
Functional, technical, and regulatory requirements
3.2 Defining Project Scope and Deliverables
Scope statement, exclusions, assumptions
3.3 Early Value Engineering and Constructability Review
Initial VE workshops to optimize design and construction methods
3.4 Preparation of Project Execution Strategy
Construction methodology, phasing, resource planning
4.1 Design Team Selection and Roles Definition
Architects, engineers, specialists roles
4.2 Integrated Design Development Process
Coordination between architecture, structural, MEP, and other disciplines
4.3 Design Review and Quality Assurance
Milestones, design freeze, review checklists
4.4 Managing Design Changes and Approvals
Change control procedures and impact assessment
5.1 Preparation of Preliminary Cost Estimates
Conceptual & schematic cost estimation techniques
5.2 Bill of Quantities (BOQ) Development
Detailed takeoff, unit rates, provisional sums
5.3 Budget Approval Process and Cost Control Mechanisms
Contingency planning, budget sign-off
5.4 Cost Risk Analysis and Mitigation Strategies
Cost escalation, market fluctuations, inflation considerations
6.1 Procurement Method Selection
Design-bid-build, design-build, EPC, PPP models
6.2 Vendor Prequalification and Tendering Process
Criteria, bid invitation, evaluation
6.3 Contract Types and Clauses for Large Projects
Lump sum, unit rate, cost-plus, incentive clauses
6.4 Contract Management and Legal Considerations
Contract administration, risk allocation, dispute resolution
7.1 Identification and Assessment of Pre-Construction Risks
Technical, financial, environmental, and legal risks
7.2 Risk Mitigation and Contingency Planning
Risk register, monitoring mechanisms
7.3 Health, Safety, and Environmental (HSE) Planning
Site safety protocols, environmental management plans
7.4 Emergency Preparedness and Response Planning
Disaster management, evacuation plans
8.1 Development of Pre-Construction Schedule
Key activities, milestones, lead times
8.2 Critical Path Method (CPM) and Network Analysis
Schedule optimization, float analysis
8.3 Integration of Multi-Discipline Schedules
Design, procurement, and permit timelines
8.4 Monitoring and Updating Schedule During Pre-Construction
Progress tracking tools, schedule variance analysis
9.1 Human Resource Planning for Pre-Construction Phase
Skills requirement, team mobilization
9.2 Material and Equipment Planning
Long lead items, procurement scheduling
9.3 Site Logistics and Temporary Facilities Planning
Access roads, site offices, storage, utilities
9.4 Coordination with Authorities and Utilities Providers
Coordination for power, water, telecom, road closures
10.1 Preparation and Management of Pre-Construction Documentation
Tender documents, design reports, permits, approvals
10.2 Reporting Mechanisms and Progress Tracking
Regular status reports, dashboards
10.3 Communication Plan and Stakeholder Engagement
Information flow, meeting schedules, conflict management
10.4 Lessons Learned and Continuous Improvement
Feedback loops, updating procedures and best practices
After successful purchase, this item would be added to your courses.You can access your courses in the following ways :