There are no items in your cart
Add More
Add More
Item Details | Price |
---|
NRM1: Take-Off and Preparing Cost Plan BOQ Procedure – Practical Guide for Civil Engineers & Quantity Surveyors
Language: ENGLISH
Instructors: BHADANIS QUANTITY SURVEYING & CONSTRUCTION MANAGEMENT INTERNATIONAL TRAINING INSTITUTE 2016
Validity Period: 250 days
4 BHADANIS Institute Coins as Cashback
Why this course?
Objective: Understand the purpose, structure, and role of NRM1 in cost planning and BOQ preparation.
Submodules:
Purpose of NRM1 – Alignment with RICS standards, scope, and industry usage.
Relationship with Cost Management Process – How NRM1 fits from feasibility to final account.
Classification Structure – Work breakdown, group elements, and coding.
Practical Case – Sample high-rise cost plan structured per NRM1.
Objective: Explore how BOQs are structured under NRM1.
Submodules:
Role of BOQ in Cost Planning – Link to design stages.
BOQ Formats under NRM1 – Elemental, work section, and combined formats.
Measurement Principles – Consistency and standard terminology.
Example & Template – Elemental BOQ layout for a G+45 high-rise.
Objective: Measure preliminaries in compliance with NRM1.
Submodules:
Definition & Purpose – Temporary works, site setup, and management costs.
Measurement Rules – Preliminaries per NRM1 section 0.
Cost Plan Integration – Linking preliminaries to cost planning stages.
Template – Preliminaries BOQ sheet with example rates.
Objective: Apply NRM1 rules for substructure works.
Submodules:
Scope of Substructure – Foundations, basements, and retaining walls.
Measurement Units – m³, m², item basis.
Worked Example – Raft foundation take-off sheet.
Template – Substructure BOQ with coding.
Objective: Prepare accurate BOQs for superstructure elements.
Submodules:
Scope of Superstructure – Columns, beams, slabs, walls.
Measurement Rules – Elemental grouping per NRM1.
Worked Example – Slab take-off calculation.
Template – Superstructure BOQ for RC frame.
Objective: Take-off and cost plan finishes accurately.
Submodules:
Internal Finishes – Floors, walls, ceilings.
External Finishes – Cladding, renders, paints.
Worked Example – Floor tiling BOQ sheet.
Template – Finishes cost plan summary.
Objective: Apply NRM1 rules for FFE items.
Submodules:
Scope – Fixed & loose furniture, equipment.
Measurement Units – No., item, set.
Worked Example – Kitchen fit-out BOQ.
Template – FFE schedule with cost integration.
Objective: Capture mechanical, electrical, and plumbing works.
Submodules:
Mechanical Systems – HVAC, lifts, escalators.
Electrical Systems – Lighting, power distribution.
Plumbing & Drainage – Water supply, sewage.
Template & Example – MEP BOQ extract.
Objective: Apply NRM1 measurement rules to landscaping and site development.
Submodules:
Scope – Roads, pavements, boundary walls.
Measurement Units – m, m², m³, item.
Worked Example – Asphalt paving take-off.
Template – External works BOQ sheet.
Objective: Understand provisional and PC items under NRM1.
Submodules:
Definition & Purpose – Allowances for undefined works.
How to Include in BOQ – Formatting rules.
Worked Example – Provisional sum entry for façade system.
Template – BOQ page with provisional & PC items.
Objective: Turn quantities into a priced cost plan.
Submodules:
Rate Build-Up – Labour, material, plant, overheads.
Market Rate Adjustments – Inflation, location factors.
Worked Example – RC beam rate build-up.
Template – Priced BOQ sheet.
Objective: Consolidate BOQ data into a cost plan per NRM1.
Submodules:
Elemental Cost Analysis – Grouping costs by elements.
Comparative Cost Studies – Benchmarks and historic data.
Worked Example – G+10 office building cost plan.
Template – Elemental cost summary sheet.
Objective: Ensure accuracy and compliance with NRM1.
Submodules:
Common Errors – Omissions, double counting, misclassification.
Cross-Checking Methods – Elemental vs. work section totals.
Worked Example – BOQ reconciliation check.
Template – QA checklist for BOQ.
Objective: Use the BOQ as a contractual and financial tool.
Submodules:
Tendering Role – Basis for pricing and negotiation.
Contract Payment – Interim valuations.
Variation Management – Measuring changes from BOQ.
Example – BOQ extract showing variation adjustment.
Objective: Manage costs post-construction using the BOQ framework.
Submodules:
Final Account Preparation – Reconciling actual vs. BOQ.
Cost Reporting – Periodic updates.
Worked Example – Final account statement for a residential project.
Template – Final account summary sheet.
After successful purchase, this item would be added to your courses.You can access your courses in the following ways :