Pop-Up Message
Call Us CALL US !

Estimation and Costing Course based on Maharashtra PWD Schedule of Rates (SOR) महाराष्ट्र PWD शेड्यूल ऑफ रेट्स (SOR) आधारित मोजणी आणि खर्च गणनेचा कोर्स

Estimation and Costing Course based on Maharashtra PWD Schedule of Rates (SOR)  
महाराष्ट्र PWD शेड्यूल ऑफ रेट्स (SOR) आधारित मोजणी आणि खर्च गणनेचा कोर्स

Language: MARATHI & ENGLISH

Instructors: BHADANIS PWD ONLINE TRAINING INSTITUTE

Validity Period: 250 days

₹20500 9.76% OFF

₹18500

4 BHADANIS Institute Coins as Cashback

PREVIEW

Why this course?

Description

Estimation and Costing Course based on Maharashtra PWD Schedule of Rates (SOR)  महाराष्ट्र PWD शेड्यूल ऑफ रेट्स (SOR) आधारित मोजणी आणि खर्च गणनेचा कोर्स

Module 1: Introduction to Maharashtra PWD Schedule of Rates (SOR)

  • 1.1 Overview of Maharashtra PWD and Its Role in Infrastructure Development
    Understanding Maharashtra PWD's organizational structure, project types, and key responsibilities.

  • 1.2 Understanding Schedule of Rates (SOR) – Definition and Importance
    Role of SOR in government projects, types of SOR in Maharashtra, and legal framework.

  • 1.3 Components of Maharashtra PWD SOR
    Classification of items, work groups, units of measurement, and rate fixation.

  • 1.4 How to Use Maharashtra PWD SOR for Estimation
    Navigating the SOR document, item identification, and cross-referencing with technical specifications.


Module 2: Basics of Estimation and Costing in PWD Projects

  • 2.1 Types of Estimates in PWD Projects
    Preliminary, detailed, revised, and supplementary estimates with examples.

  • 2.2 Units of Measurement and Conversion Factors
    Understanding units used in SOR, conversion methods, and practical applications.

  • 2.3 Quantification Process for Civil Works
    Measurement rules as per PWD guidelines and how to extract quantities accurately.

  • 2.4 Role of Rate Analysis in Costing
    Principles of rate analysis, base rates, and escalation factors in Maharashtra context.


Module 3: Detailed Understanding of Civil Work Items in Maharashtra PWD SOR

  • 3.1 Earthwork and Excavation Items
    Types of excavation, measurement rules, and costing approach.

  • 3.2 Concrete and Cement Work Items
    Grades of concrete, formwork, curing, and rate considerations.

  • 3.3 Masonry and Brickwork Items
    Types of masonry, brick specifications, mortar mix, and costing methods.

  • 3.4 Finishing Works (Plastering, Painting, Flooring)
    Specifications of finishing materials, application methods, and cost factors.


Module 4: Rate Analysis and Component Costing

  • 4.1 Material Cost Calculation According to Maharashtra Market Rates
    How to collect market rates, wastage considerations, and price adjustments.

  • 4.2 Labour Cost Determination as per PWD Norms
    Labour categories, wage rates, productivity factors, and allowances.

  • 4.3 Equipment and Machinery Costing in Estimation
    Hiring charges, operating costs, depreciation, and allocation.

  • 4.4 Overheads and Contractor Profit in Rate Analysis
    Types of overheads, percentages commonly applied, and profit margin considerations.


Module 5: Preparation of Bill of Quantities (BOQ) as per Maharashtra PWD SOR

  • 5.1 Principles of BOQ Preparation for PWD Projects
    Format, sequence, and standard clauses.

  • 5.2 Measurement and Quantity Calculation for BOQ Items
    Step-by-step quantification for complex items.

  • 5.3 Integration of SOR Rates into BOQ
    Applying SOR unit rates and adjustments for site conditions.

  • 5.4 Checking and Finalizing BOQ for Tendering
    Cross-verification, error prevention, and documentation standards.


Module 6: Estimation for Road Works under Maharashtra PWD

  • 6.1 Understanding Road Work Items in Maharashtra SOR
    Earthworks, subgrade preparation, and base course specifications.

  • 6.2 Costing of Bituminous Works
    Types of bituminous mixes, application methods, and rate analysis.

  • 6.3 Drainage and Protective Works in Road Construction
    Culverts, side drains, and retaining walls costing.

  • 6.4 Road Finishing and Safety Works Estimation
    Road marking, signage, guard rails, and related costs.


Module 7: Estimation of Bridge and Culvert Works as per Maharashtra PWD SOR

  • 7.1 Classification of Bridges and Culverts in Maharashtra PWD
    Types, sizes, and structural components.

  • 7.2 Estimation of Foundation and Substructure Works
    Piling, footing, abutments, and wing walls quantification and costing.

  • 7.3 Superstructure Estimation: Girders, Deck Slabs, and Parapets
    Concrete, reinforcement, and formwork calculation.

  • 7.4 Ancillary Works Estimation: Expansion Joints, Bearings, and Drainage
    Costing for special items and maintenance provisions.


Module 8: Structural Steel and Reinforcement Estimation

  • 8.1 Steel Reinforcement Bar (Rebar) Measurement and Costing
    Cutting length calculation, bending allowances, and wastage.

  • 8.2 Structural Steel Sections as per Maharashtra PWD SOR
    Types, rates, and weight calculations.

  • 8.3 Fabrication and Erection Charges for Steel Works
    Labour and equipment cost considerations.

  • 8.4 Protective Coatings and Finishing for Steel Structures
    Painting, galvanizing, and their cost impact.


Module 9: Plumbing and Sanitary Works Costing as per PWD Standards

  • 9.1 Estimation of Water Supply Systems
    Pipes, fittings, valves, and installation charges.

  • 9.2 Sanitary Installation Costing
    Fixtures, traps, drainage pipes, and labour.

  • 9.3 Rainwater Harvesting and Stormwater Drainage Works
    Quantification and costing per Maharashtra PWD norms.

  • 9.4 Testing and Commissioning Charges
    Quality assurance activities and related expenses.


Module 10: Electrical Works Estimation in PWD Projects

  • 10.1 Electrical Wiring and Conduit Estimation
    Cable sizing, length measurement, and material costing.

  • 10.2 Lighting Fixtures and Installation Charges
    Types of fixtures, mounting, and labour.

  • 10.3 Power Distribution and Control Panels Costing
    Switchgear, panels, and accessories rates.

  • 10.4 Earthing and Safety Systems Estimation
    Earthing rods, cables, and testing cost factors.


Module 11: Estimation of Landscaping and External Works

  • 11.1 Earthworks and Soil Preparation for Landscaping
    Levelling, soil filling, and treatment cost.

  • 11.2 Planting and Nursery Supplies Costing
    Plants, saplings, mulch, and materials.

  • 11.3 Hardscape Works: Paving, Footpaths, and Boundary Walls
    Materials and labour costing.

  • 11.4 Irrigation System Estimation
    Sprinklers, drip lines, and controls costing.


Module 12: Contingencies, Provisions, and Escalation in Estimation

  • 12.1 Understanding Contingency in Project Costing
    Types, percentages, and application as per Maharashtra PWD.

  • 12.2 Provisions for Price Escalation and Inflation
    Calculation methods and clauses in contracts.

  • 12.3 Provisions for Taxes, Duties, and Statutory Levies
    GST, octroi, and local taxes impact.

  • 12.4 Risk Allowances and Unforeseen Expenses
    Identification, quantification, and inclusion in estimates.


Module 13: Tendering Process and Costing Strategy for Maharashtra PWD Projects

  • 13.1 Understanding Tender Documents and Conditions
    Types of contracts and submission requirements.

  • 13.2 Costing for Competitive Bidding
    Mark-up strategies, risk margins, and profit optimization.

  • 13.3 Bid Analysis and Comparative Statement Preparation
    Evaluation of competitor rates and market trends.

  • 13.4 Post-Tender Negotiation and Contract Finalization
    Cost impact assessment and contract terms review.


Module 14: Measurement and Billing Procedures in Maharashtra PWD Projects

  • 14.1 Measurement Book (MB) Preparation and Maintenance
    Guidelines, formats, and best practices.

  • 14.2 Running Account and Final Bill Preparation
    Methods, verification, and documentation.

  • 14.3 Handling Variations and Extra Items
    Procedures for variation orders and rate fixation.

  • 14.4 Audit and Quality Checks in Billing
    Compliance with government audit requirements.


Module 15: Case Studies and Practical Applications in Maharashtra PWD Estimation

  • 15.1 Case Study: Estimation of a Road Construction Project
    Detailed quantity takeoff and costing example.

  • 15.2 Case Study: Estimation of a Small Bridge Project
    Stepwise BOQ and rate analysis.

  • 15.3 Practical Exercise: Preparing Rate Analysis for Concrete Work
    Market survey and cost calculation.

  • 15.4 Practical Exercise: Preparing Running Account Bill for a PWD Project
    Documentation and verification.

Course Curriculum

How to Use

After successful purchase, this item would be added to your courses.You can access your courses in the following ways :

  • From the computer, you can access your courses after successful login
  • For other devices, you can access your library using this web app through browser of your device.